This report is available to all roles with access to both the Reports and Stations modules.
Read more about generating reports.
The Charging points' KPIs report contains a rating of all EVSEs of the selected organisations according to different performance parameters excluding archived stations.
It is only available on the latest 90 days from the date the report is being generated.
Report contents
Column header | Description |
---|---|
Station ID |
Internal system ID of the charging point |
Model |
Model of the charging station |
Charging sessions |
Count of all charging sessions started on this charging point during the selected time frame |
Utilization rate % |
Percentage of the selected time frame during which this charging point was in use. |
Errors |
Count of all error messages sent by this station during the selected time frame. This excludes “NoError” error messages. |
Offline % |
Percentage of the selected estimated time frame during which this charging point was offline (= disconnected) |
Faulted % |
Percentage of the selected time frame during which this charging point was faulted |
Disconnection(s) |
Count of all disconnections of this station during the selected time frame. |
kWh charged |
How many estimated kWh have been charged on this charging point during the selected time frame. What this also means is that:
|
Turnover generated |
How much estimated money have been generated on this charging point during the selected time frame in the CPO’s currency (visible in the next column) What this also means is that:
|
Currency |
The currency of the generated turnover |
Comments
0 comments
Please sign in to leave a comment.